List of Projects

Energy Works Technology / Total Energies

  • OLT Suction Piles for EGINA UFR Project – ✅ Completed
  • Fabrication of Pressure Vessels and Process Modules for TOTAL Nig. Plc, EGINA FPSO – ✅ Completed
  • Upgrade of Jones Creek & Odidi Flow Station (OML-42 Water Management Project) – ✅ Completed
  • IDOHO BP Structural Integrity Repair Project – ✅ Completed
  • Fabrication of Pig Launcher, Pig Receiver, Open Drain and Closed Drain (Ikike Project) – ✅ Completed
  • Knock-Out Drum Vessel for EGINA Project – ✅ Completed

Saipem Contracting Nigeria Limited

  • Supply of Civil Materials for SSAGS Project (Ogbotobo, Beneside, Opukushi, Tunu) – ✅ Completed
  • Supplies of AGO for NLNG Train 7 Project, Bonny Island – ✅ Completed

LES Energy Services Ltd.

  • Supply of Fabrication Pipes, Consumables and Equipment for USAN & ERHA ExxonMobil Project – ✅ Completed
  • Supply of Consumables and Equipment for Idoho & Edop ExxonMobil Project – ✅ Completed
  • Supplies of Scaffolding Equipment and Materials for Shutdown Activities – 🚧 Ongoing

Energia Limited

  • Upgrade of Production Field and Water Separator – ✅ Completed

Ripen Marine Contractors

  • Fabrication of Calm Buoy Clamp and Loading Pad – ✅ Completed

OilServ

  • Fabrication of Pressure Vessels and Process Modules for NNPC OB3 Lot B – ✅ Completed
  • AKK Gas Pipeline Project (40" x 303.4km + 24" x 15km Spur Line) – 🚧 Ongoing
  • Installation of ASSA Gas Pipeline Project (12" x 28km) – 🚧 Ongoing

AITEO Eastern E&P Company Limited

  • Provision of 100 Man House Boats, Tug Boats, Barges, Crew, GSF and Offshore Support – ✅ Completed

PFL Engineering Services

  • Supply of Blasting, Painting and Coating Materials for Agbami FPSO – 🚧 Ongoing

Renaissance Africa Energy Company Ltd

  • Procurement and Installation of Four Autosamplers to SPDC Locations: AGBADA 1, AGBADA 2, OBIGBO & UMECHEM – ✅ Completed

Chevron

  • Provision of Security Vessels, Crew, GSF and Offshore Support – ✅ Completed

Nigeria LNG Limited

  • Provision of Fabric Maintenance Services: Coating, Insulation and Fireproofing Systems at NLNG Facilities – ✅ Completed

SPDC (Shell Petroleum Development Company)

  • Front View of ADDAX 3 Phase Test Separator Vessel – ✅ Completed
  • 90mm Thick Stainless Steel Clad Separator (Soku Nag Compression Project) – ✅ Completed
  • OPUC 1 - V - 4611 / 4621 / 6401 – ✅ Completed
  • Manufacture of Pressure Vessels for EGINA FPSO (Subcontractor to Samsung Heavy Industries) – ✅ Completed
  • TO VZ 7521 – ✅ Completed
  • TOVZ 7002 – ✅ Completed
  • Provision of Security Vessels, Crew, GSF and Offshore Support – ✅ Completed
  • Pressure Vessel for DOMGAS HP Flare ILO (V-4301 & V-4302) – ✅ Completed
  • ADDAX 3 Phase Test Separator Vessel – ✅ Completed

Heirs Energies

  • Installation of LACTS Units for 4 HEL OML 17 Production Facilities: Agbada 1, Umuchem, Obigbo North – ✅ Completed